Click call or text to contact Joe at (905) 687-0071

Semi-Frame Window Change Installation

Separating the jam extension from the old frame.

New foam insulation inserted behind the existing jam extension.

Reconstruct the frame and insulate between the new frame and the old jam extension.

Windows are installed leaving space for insulation between the new window and the new frame.

Insulation is covered with a snap-in vinyl moulding.

Outside we reconstruct the outer brick mould and then we insulate behind the new window.

Upon completion we cap all of the outside with aluminum.